BIM Coordination & Mechanical 3D Modeling for the East Peoria Police Station

The Wassi Group (TWG) was contracted by Illinois Piping Co. to support the mechanical and HVAC coordination efforts for the new East Peoria Police Station. Our role focused on creating fully coordinated 3D Revit models and producing detailed 2D drawings to aid in mechanical planning, clash detection, and construction efficiency.




Project Scope

TWG collaborated closely with Illinois Piping Co. to develop accurate and installation-ready 3D models for HVAC and mechanical piping systems.

Working within Revit, our team created detailed system layouts to support interdisciplinary clash detection and installation planning. These coordinated models formed the basis for producing sheeted 2D drawings used in field installation and contractor review.


Our scope of work included:



Results

TWG delivered a fully coordinated BIM package that enhanced construction efficiency and reduced field conflicts for Illinois Piping Co. The final deliverables provided:

By leveraging Revit and structured BIM coordination workflows, The Wassi Group delivered a precise and reliable mechanical modeling package that supported smooth construction of the East Peoria Police Station.






Contact The Wassi Group to learn how our modeling and coordination services can enhance construction readiness, reduce field conflicts, and keep your project moving efficiently.