Close

October 2, 2013

Facility Engineering

featured
Project:
Facility Engineering
Client:
Various
Description:
The Wassi Group has worked with a leading heavy equipment manufacturer for a variety of projects in Facility Engineering. Projects include a 25 ton monorail crane for lifting ship engines at the marine engine division. TWG was also brought in to verify existing machines and equipment in entire facilities for new equipment layouts. CAD drawings are created for locating equipment in the facility prior to installation. From these drawings, process engineers can lay the machines out several ways to find the best possible orientation for the operator’s needs. Along with equipment layouts, TWG has worked with engineers to create the foundations, platforms, cranes and all other necessary installations required for installing equipment.